Hill Street Dog Park Community Coalition logo
← hillstreetdogpark.ca
Vote on the solutions

Which options should the City consider?

Community voting is open

Which options should the City consider?

Review seven options for Hill Street Dog Park — six community-proposed, plus a no-change baseline — and select up to three you would support. The results will help identify the three most-supported alternatives to bring to the City.

Closes Sunday, September 27, 2026 at 11:59 p.m. Eastern Time.

The park today

The small-dog area runs from the west double gate to the fence beside the gazebo — about a third of the off-leash area, with the main area taking the other two-thirds. Every option below is a change to that.

WaterHill St.West gateEast gateLocked gateSmall-dog area33% of the parkMain area67% of the park

About these drawings

These are concept diagrams, not surveyed or construction-ready plans. They use the same reference outline to help compare proposals. Current fence placement and area measurements remain unconfirmed, and proposed boundaries are approximate. All options would need City review for feasibility, access, and safety. Percentages below are an approximate share in each concept drawing, not a surveyed measurement.

For background on park use and the observations behind this process, see the community evidence report →

You can choose up to 3 options below. Check the box on each option you'd support — you don't have to pick all three.

Submit your ballot

Select up to three options above, then enter your email address below. Please participate only once, even if you have more than one email address.

Your email address is collected to check for repeat ballots. Please read the voting and privacy information below before submitting.

Results will be published here after voting closes and the ballots have been checked.

How this poll works

This is an informal, community-organized poll to compare the listed proposals. It is not a City referendum or a representative sample of every park user. The City remains responsible for assessing and approving any changes.

Results will be published after voting closes and the ballots have been checked. We will report support for every option, explain the counting method, and identify the alternatives being advanced.

We are still collecting park-use observations and petition signatures. These remain important alongside the voting results.

You may select up to three options. Your selections are not ranked; each selected option receives one count of support, and the reported shares are based on the number of ballots cast, not the number of votes — since one ballot can support more than one option, shares can add up to more than 100%.

Each option is drawn on the City’s reference drawing of the park and measured off it, and the shares are given on the same one-third / two-thirds basis the coalition uses for the area as it stands today. That drawing labels its own internal fence line and acre split as unconfirmed, and Option B’s boundary follows the path, which the drawing does not show — it is placed from the line the submitter drew between two gates. Treat the figures as proportions measured off a drawing rather than surveyed measurements; what they settle firmly is the order and the gaps between the options.